The Bush School
Our Community

Center Campus and Middle School Project

Center Campus and Middle School Building


The At the Heart of Bush Campaign centers the student experience and brings our K–12 community together. Scheduled to open in fall 2027, the new three-story, 26,000-square-foot building and full renovation of the Harrison and Republican wings will establish a vibrant K–12 campus center, an elevated Middle School, and permanent homes for key priorities, including the K–12 Learning Support Center, The Center for Community Engagement and Equity in Action, and the K–12 Makerspace and Robotics Lab. As one of the largest building projects in the school’s history, it is the final chapter of a nearly 30-year campus master plan and the foundation for Bush’s second century of leadership and excellence in education.

- Karim Lessard ’89, Parent of Jack ’22 and Lucy ’28

“The Bush School is a special place, built on the generosity of families, community, and alumni who have been imagining the future of experiential education for over 100 years. Today, our own children benefit. At Bush, teachers know them, the community supports them, and they spend each day at a campus designed with them in mind—full of inspiring spaces to learn, grow, and thrive. This campaign is our opportunity to say thank you and to continue this legacy of our community investing in our students. We hope you’ll join us.”
 

Building Components

THE COMMONS

The Commons is where all three divisions will come together every day to gather and connect. The new space will include:
 
  • An inviting campus entry, spacious student art gallery, and welcoming lobby
  • A Commons dining hall that will seat 250—nearly double today’s 128—so students, faculty, and families can share a meal together
  • Open onto the Middle School Courtyard with floor-to-ceiling windows and flexible furniture designed for inclusion and belonging
  • Serve as a welcoming, central space for community events 

MIDDLE SCHOOL
 
The Middle School building will offer flexible and dynamic learning spaces that cater to different learning styles and include formal and informal spaces to teach, mentor, create, and learn.
 
  • Six Middle School classrooms
  • Two Middle School science labs 
  • Student hubs for collaboration, independent study, or social time 
  • Middle School faculty workspaces
 
RENOVATIONS TO EXISTING SPACES
 
Beyond the new building, At the Heart of Bush Campaign will support renovations to the Harrison Street wing of the original Middle School. Program offices will include a K–12 Learning Support Center, The Center for Community Engagement and Equity in Action, a K–12 Makerspace and Robotics Lab, a Wellness Center, and a prayer room. These additional spaces will complement the new Middle School building and contribute to fostering the inspiring and inclusive environment that supports each Bush student.

PROJECT FREQUENTLY ASKED QUESTIONS

List of 5 items.

  • Construction Timeline & Impact

    Winter 2026: construction begins (estimated 18 month construction project)
     
    Fall 2027: students begin classes in the new building with the start of the school year 

    During construction we want to minimize disruption for all students and especially the Middle School students. Students will stay on campus, and we are exploring how to best utilize the spaces we have in the Republican and Harrison wings and additional space in the Upper School. 

    We are exploring options to provide food during construction for the entire K-12 student, faculty/staff community that the Commons provides. We will move Upper School food service to the Upper School Pantry. Food will be prepared offsite and brought to campus to distribute. We are discussing options to determine where eating will take place, which could include classrooms and outdoor spaces.

    The current Sixth Grade Wing (along E. Harrison Street) and the Middle School Building along E. Republican Street will remain in-tact. With the majority of Middle School classes held in the new building, the purposes of these spaces will be re-imagined and refreshments will occur.
  • What will Happen to the Harrison and Republican Wings?

    We are planning to repurpose the Harrison wing by creating a Center for Community, Equity, and Inclusion, a Learning Support Center, and a Makerspace. The Republican wing will receive classroom, teacher workspaces, and other updates.

    Some additional details:
    • Both the Harrison and Republican wings will undergo several common improvements, including new carpeting throughout, interior and exterior painting, installation of acoustical panels and elements, updated casework, and modernized electrical systems and outlets. Ceilings and lighting will remain in most areas, with new ceilings and lighting fixtures added to reworked spaces. The intent is for new furniture for both buildings. Additionally, each building will receive a new mechanical unit for heating and cooling, although windows will not be upgraded in this project. Doors will remain but with new hardware.
    • In the Republican wing, three classrooms will be enhanced with new teaching walls and interactive boards. The renovation will also include two teacher workspaces, a laboratory, and a music room. Existing lockers will be replaced with a new two-tier system, while restrooms will be expanded and water fountains will be modified to meet ADA compliance.
    • The Harrison wing will feature several new dedicated spaces, including a prayer room, wellness room, and Community, Equity, and Inclusion space. A comprehensive Learning Support Center will be created, offering private tutoring areas, a formal conference space, and general workstations. The wing will also include a Middle School makerspace, which will be equipped with laser cutters, 3D printers, a green screen, and a teaching wall with an interactive board.
  • Which Architecture Firm is the School Using?

    We are using Mithun Architects, a highly regarded and award-winning West Coast firm. They are familiar with The Bush School and our unique needs as they designed the Upper School building.
  • Sustainability - Environmental Certification Considerations

    We are committed to Salmon-Safe certification across campus. As a leading U.S. ecolabel, Salmon-Safe offers peer-reviewed certification, linking site development and land management practices with the protection of agricultural and urban watersheds.

    Additionally, we are pursuing Zero net Carbon certification. 
    • Zero Net Carbon certified buildings are verified by a third-party after a twelve-month performance period to be energy efficient, combustion free (or actively phasing out combustion), and powered by renewals.
  • Additional Information

    As was the case with the Upper School South Building, this project will be funded through a combination of philanthropy and financing. There will be opportunities for the entire community to learn more about the building and how they can get involved as construction nears.

Connect with Us

To learn more about the At the Heart of Bush Campaign, please contact Melissa Englund, Director of Development, at melissa.englund@bush.edu or 206.838.8825. 

List of 1 members.

  • Photo of Melissa Englund

    Melissa Englund 

    Director of Development
The Bush School is an independent day school located in Seattle, WA enrolling 773 students in grades K–12. The mission of The Bush School is to spark in students of diverse backgrounds and talents a passion for learning, accomplishment, and contribution to their communities

3400 East Harrison Street, Seattle WA 98112 (206) 322-7978
The Bush School does not discriminate in matters of employment, recruitment, admissions, or administration of any of its programs on the basis of race, color, creed, religion, national or ethnic origin, disability, gender, or sexual orientation. In addition, The Bush School does not discriminate in matters of employment on the basis of age or marital status
© 2022  The Bush School